Recover password

Crews prep the deck and apply an epoxy overlay on an Interstate 40 bridge between Carlisle NE and the Big I. The work requires multiple steps and applications, with temperatures at least 50 degrees and rising and preferably 65 to 75 degrees for faster curing. (Courtesy of NMDOT)

TOP |